Re: Hybrid failure already? LG42PC1D
First, check between 15V and ground, what do you measure?
No short should be present after removal.
Potential locations for caps are indicated in the image attached. Install both with ~47uF 35V devices (Panasonic FM is good here) - but ONLY if +15V and ground measures about 15V.
First, check between 15V and ground, what do you measure?
No short should be present after removal.
Potential locations for caps are indicated in the image attached. Install both with ~47uF 35V devices (Panasonic FM is good here) - but ONLY if +15V and ground measures about 15V.
Comment