I got the UPS working today.
I replaced the Caps, Op-Amp and ADC.
At first it was reading the Bat voltage well again, but the line voltage was 100V less than it should (220)...
When I first had the problem I searched all over the web and someone at the EEVblog forum mentioned that APC UPSes sometimes have resistor problems.
I think the issue was in fact a soldering problem (solder joints). I resoldered the sensing resitors arround the ADC and assembled it all again.
It worked.
Lets see for how long

Thanks.
Leave a comment: